Specialty Installation (Shallow Trench, Direct Bury Cable)
Increased Horizontal Direction Drilling (Directional Boring) Use
High Energy (Natural Gas or Plasma fueled) Boring (EarthGrid)
Longer Bore Run & Longer Cable Pull Back
Straight Conduit Installation
Prefabrication
3D Design paired with site visualization and mapping
Range-taking shear-bolt conductor connectors
Improved accuracy, reliability, and speed of commissioning tests
Increased Horizontal Direction Drilling (Directional Boring) Use
High Energy (Natural Gas or Plasma fueled) Boring (EarthGrid)
Longer Bore Run & Longer Cable Pull Back
Straight Conduit Installation
Prefabrication
3D Design paired with site visualization and mapping
Range-taking shear-bolt conductor connectors
Improved accuracy, reliability, and speed of commissioning tests